On Air Now

The Retro Coast

2:00pm - 3:00pm

  • 01723 336444

Now Playing

Soft Cell

Say Hello Wave Goodbye

Download

Green Light for Major Roof Repairs at Scarborough Railway Station

Wednesday, 23 July 2025 06:00

By Anttoni James Numminen, Local Democracy Reporter

A major project to repair and upgrade Scarborough Railway Station’s roof and improve passenger safety has been approved after plans were changed.

Network Rail’s application for wide-ranging repairs to the Central Railway Station, including replacing the timber lantern roof and renewing the main station and train shed roof, can go ahead, North Yorkshire Council has ruled.

The roof repairs are part of a £14m project to improve the coastal town’s Grade II listed railway station.

The station’s trainshed roof lantern will be replaced, alongside other internal and external repairs, while a fire escape ladder will be added to an existing lightwell.

Repairs to timber, stone and mortar will also be undertaken, and the gutters and other drainage systems will be updated and replaced.

North Yorkshire Council’s conservation officer originally objected to the proposal over concerns that a proposed roof access system would “negatively impact the architectural interest of the listed building”.

However, after amendments were introduced to the proposal, the conservation officer said that the repairs would be “less visually intrusive and would not result in harm to the aesthetic significance of the heritage asset”.

The officer added: “The location of the new roof access structures is now limited to only where necessary, and largely upgrades and renews existing provisions.

“The alterations are proposed to areas around the station buildings where the overall architectural interest would not be harmed.”

The roof lantern replacement will be an exact reproduction in terms of design and appearance to the existing roof lantern, and “therefore, visually, will not detract from the architectural history of the feature,” a planning report notes.

Officers concluded that the scheme would “successfully preserve the special interest” of the historic site, and permission was granted subject to conditions.

Designed by GT Andrews, Scarborough’s Central Railway Station was constructed as the terminus of the York and North Midland Railway from York and opened to train services in July 1845, while the “elaborate baroque clock tower” was added in 1882.

 

Did you find this article useful?

This is the Coast is committed to providing a daily local news service for the Yorkshire Coast. We are a small locally owned and operated business which employs professional journalists and reporters. We do not receive any public funding or grants and we are entirely funded by our local commercial operations. We enjoy fabulous support from local businesses who work with us on their advertising and marketing campaigns, but the cost of providing high quality, well researched, fact checked local news coverage is significant.

If you appreciate what This is the Coast does, and would like to help support our journalism, please consider supporting us on a monthly basis today.

A small contribution from all our readers would really help support independent journalism for the Yorkshire Coast.

More from Yorkshire Coast News

Comments

Add a comment

Log in to the club or enter your details below.

Follow Us

Get Our Apps

Our Apps are now available for iOS, Android and Smart Speakers.

  • Available on the App Store
  • Available on Google Play
  • Just ask Amazon Alexa
  • Available on Roku

Today's Weather

  • Scarborough

    Medium-level cloud

    High: 19°C | Low: 15°C

  • Filey

    Medium-level cloud

    High: 19°C | Low: 15°C

  • Whitby

    Light rain

    High: 18°C | Low: 16°C

  • Bridlington

    Light rain shower

    High: 20°C | Low: 15°C

  • Hornsea

    Medium-level cloud

    High: 20°C | Low: 15°C

  • Driffield

    Medium-level cloud

    High: 21°C | Low: 15°C

News